![]() ![]() Improper assignment with rectangular emptyĮrror in uq_initialize_uq_sensitivity (line 861)Įrror in AUTO_EAE_UQ_Improved_SLURM_v3 (line 346) You may find additional information in the catched exeption: Something went extremely wrong while trying to evaluate the analysis ![]() So after reading your feedback, I’ve run the SOBOL analysis again, with N = 200, and N = 500 but I end up getting an error which looks as follows: I was originally running the SOBOL analysis with N = 10000, so no wonder it was taking SO long… It actually required 210000 “realizations.” This gives me a total of M = 19.Įach of these parameters are to the best of my knowledge, independent of one another. Thank you for the reply have a case where I have a total of 17 independent manufacturing input parameters to an engineered system, plus 2 parameters that account for large, important trends in operating history.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |